Sunday, June 7, 2020

[2020.6] Cisco 350-601 dccor pdf free download

2020 Real 350-601 questions and answers.One year free update. 350-601 pdf free test .
https://www.pass4itsure.com/350-601.html DCCOR 350-601 pdf dumps questions preparation material ...

Cisco 350-601 dccor pdf free download 

[DriveCisco 350-601 dccor pdf

CCNP and CCIE Data Center Core DCCOR 350-601 exam practice questions


QUESTION 1
On a Cisco Nexus 7000 Series router, witch statement about HSRP and VRRP is true?
A. When VDCs are in use, only VRRP is supported.
B. HSRP and VRRP both use the same multicast IP address with different port numbers.
C. HSRP has shorter default hold and hello times.
D. The VRRP group IP address can be the same as the configured interface IP address.
Correct Answer: D


QUESTION 2
DRAG DROP
An engineer deploys a custom guest shell rootfs onto multiple switches.
Drag and drop the steps from the left into the correct order on the right.
Export the Guest Shell rootfs.
Select and Place:

Correct Answer:
QUESTION 3
In an FCoE environment, for which two sets of data must an interface that implements the PAUSE mechanism always
provision sufficient ingress buffer? (Choose two.)
A. frames that were sent with high credit
B. frames that were sent on the link but not yet received
C. frames that were processed and transmitted by the transmitter after the PAUSE frame left the sender
D. frames that were processed and transmitted by the transmitter before the PAUSE frame left the sender
E. frames that were sent on the link and received
Correct Answer: BD
 

 QUESTION 4
Which statement about monitoring Fibre Channel traffic on a Cisco UCS 6332 Fabric Interconnect is true?
A. Fibre Channel traffic can be monitored only on one vHBA per server.
B. Fibre Channel traffic can be monitored as it is encapsulated as FCoE.
C. The monitoring of Fibre Channel traffic is limited to the default VSAN.
D. The destination port for monitoring must be an unassigned Fibre Channel port.
Correct Answer: A


QUESTION 5
Which two statements about the process of performing an EPLD upgrade on a Cisco MDS 9000 Series Switch are true?
(Choose two.)
A. The upgrade can be performed from the standby supervisor module.
B. The upgrade process disrupts only the module that is being upgraded.
C. The active supervisor can be upgraded.
D. If an upgrade is interrupted, the upgrade continues after a connection is restored.
E. Modules must be online to be upgraded.
Correct Answer: AB
  

Discount code 2020



By https://www.pass4itsure.com/350-601.html , cisco 350-601, cisco 350-601 dccor, cisco 350-601 dumps, cisco 350-601 pdf, Cisco CCNP Data Center Exam certification.

No comments:

Post a Comment